9.30.2012

Raising the Roof

Well, I guess we've been so busy enjoying our new deck since July, not to mention preparing for Luigi's arrival, that I have completely dropped the ball on finishing our deck building story. Prepare yourselves for a massive deck catch up in the weeks to come. I'm going to attempt to finish telling the story before Luigi gets here, and set up some installments to post automatically while we get used to life with a newborn. Of course, I plan to drop by and tell you all about him as well.

But let's get back to the task at hand. When I last told you about the deck, I was recounting a weekend in May when my Mom was visiting, and we all spent some time preparing the rubber roofing. This next phase of work took place over Memorial Day weekend, which, you might recall, was extremely warm. I remember well, because it was the first time I got a feel for exactly how difficult it was going to be getting through the summer pregnant.

At this point, since I'm so far behind, I will let the pictures tell most of the story. Here are a series of Greg finalizing the deck framing.




Every good structural engineer has to include some cross bracing somewhere, right?




The posts above are for the railing. 


It was a challenge to drill the bolt holes for the railing posts because of the 12" spacing Greg chose for extra stability, and the potential to screen in the deck as a room some day. 


Once the framing was settled, it was time to lay down the strips of rubber my mom and I cut. Each piece was cut as a trapezoid, so when we lined up the edge of the rubber perfectly with the edge of the joist, the troughs that were created naturally sloped away from the house. 

Now, I know I wasn't able to help much with the heavy labor of the deck this summer (not that I minded much), but I did help all day with this project, in the high 80s humid heat. And it was tough! I had the job of holding the rubber on the edge of the joist while Greg stapled it in place. He then covered the edges with a special rubber tape to ensure a water seal. 










The gutter from the roof line comes down the corner of the house, where we put the deck, so Greg put in a pipe to divert the downspout under the decking, but above the rubber roofing, so the run off from the roof would flow out with the water that falls through the decking surface. 



A few days after the rubber roofing went on, our decking boards were dropped off from a local lumber yard. It was really exciting to see them arrive, knowing we would soon be able to actually stand on our new deck!


6.19.2012

Cutting Rubber

The weekend after Mother's Day, my mom was kind enough to come and visit us so Greg could keep working on the deck framing. She did a lot of great yard work for us while she was here, but Greg also put us to work cutting the rubber roofing which you can see in the foreground. 




The rubber roofing is needed to waterproof the shed that will be under the shed. Greg came up with the idea to cut it into trapezoids, one for each space between two joists. When the trapezoids are fastened to the tops of the joists, there will be a natural slope away from the house to collect all the water that come through the decking, and direct it to a gutter at the far end of the deck.


I carefully measured out the spacing for the trapezoids, then the three of us snapped chalk lines, and my mom and I raced to see who could cut more sections the fastest. My mom is very competitive, so we got the job done fast!