7.08.2012

It's time to do the nursery


In case you haven't heard yet, Greg and I expecting a baby boy this October! We beyond thrilled! And of course, this opens up a whole new realm of home improvement projects. So, yes, I will admit, while Greg has been busy building the deck all spring, I have been doing a lot of napping in the hammock, but I have also been doing a lot of prep work on our son's nursery. I thought I'd share a little preview of what we're planning so far. Oh, and in the images below, you'll see we've given him the nickname "Luigi" so we can call him something more interesting than "the baby" before he gets here and we decide on an official name. (and no, we won't be sharing our list until he's actually here!)

First, here's a mood board of sorts showing the feature wall. The other three walls will be the light aqua color, which is pulled from the bedding. The bedding is Blue the Morning  Zoo from the Land of Nod. The crib is the Hudson from Babyletto, and the curtains are blackout curtains that match the green in the bedding, from many sources online. The rocking chair is an antique Victorian chair I got from my grandparents house, which my mom has been kind enough to store for me for the last decade. We plan to paint it white and reupholster it, which should be interesting, since we're essentially rebuilding it from scratch. It was literally filled with hay and horsehair! There are two windows in the room. One opposite the feature wall, and one to the left of it. The crib will nestle in between the windows. The last wall, to the right of the door is mostly just the white closet doors. 


OK, so you got it?



The tall chest of drawers is my old piece. It's a sturdy natural maple chest that I've had since I was a teen. We just got a new dresser for our bedroom that finally coordinates with the rest of our furniture...which hopefully I will get around to showing you someday. So yes, I have no problem painting natural wood. My first thought was to paint it to match the stripes on the wall, and almost camouflage it in. 



But, then I wasn't sure if it stood out enough. So, I looked at painting each individual drawer it's own color, and something that would intentionally be different than the wall stripe behind it. I think this makes it pop a bit more. 



Lastly, I love the idea of some large scale animal silhouettes that Luigi can relate too, so maybe one would work on the drawers? Especially since we're just not going to end up with a heck of a lot of bare walls at his height. At first I thought I would paint it on. But then I reminded myself about the decals, which will make it much easier to get rid of when we're mature enough to move on from zoo animals. 

The room has hardwood floors, so we want to put down some type of area rug. I am absolutely in love with carpet tiles. They have been awesome with our cats when there is a mess. We just pick it up, spray it off in the sink, let it dry, put it back. This seems like it would be a great feature in a kids room too. Not to mention that they are so easy to move around, change up the pattern, or take with you when you leave. It's pretty much a definite that we will use them here. I just have to come up with a design. I'm thinking of creating stripes on the floor with the carpet, that will run parallel to the ones on the wall, almost making it look like the wall stripes folded down onto the floor and across the room. What do you think? Too many stripes? I tend to use a lot of patterns, and mix and match. I always think it might be too much, but it hasn't yet...Maybe a checker board of just two colors, or a solid field with a contrasting boarder?

Let me know what you think. Which dresser do you like best? Thoughts on carpet patterns? Ideas where I can find a fun and colorful graphic zoo animal mobile?

And never fear, I still have tons of pictures to share of how the deck is coming along. It's all finished up top now. We just hosted two parties this week with 15 & 16 people, and everyone fit! Greg is still hard at work on the next phase...the shed enclosure. 







6.19.2012

Cutting Rubber

The weekend after Mother's Day, my mom was kind enough to come and visit us so Greg could keep working on the deck framing. She did a lot of great yard work for us while she was here, but Greg also put us to work cutting the rubber roofing which you can see in the foreground. 




The rubber roofing is needed to waterproof the shed that will be under the shed. Greg came up with the idea to cut it into trapezoids, one for each space between two joists. When the trapezoids are fastened to the tops of the joists, there will be a natural slope away from the house to collect all the water that come through the decking, and direct it to a gutter at the far end of the deck.


I carefully measured out the spacing for the trapezoids, then the three of us snapped chalk lines, and my mom and I raced to see who could cut more sections the fastest. My mom is very competitive, so we got the job done fast!




6.15.2012

A Deck Frame of Mind

The weekend of Mother's Day, we had originally planned to head to New York to visit my mom. But because of weather, and other weekends away, we postponed the trip so that some real progress could be made on the deck. Greg new he had to make the most of the weekend we didn't go to visit my mom, so he set about beginning the framing. 





The first step was to attach the ledger beam to the house.



Doug was back to help attach all the joist hangers to the beam. 



And later on, George arrived as well to help get the posts and carrying beams in place. It was actually beginning to look like it might turn into a deck someday. 


Meanwhile, the debris pile in what used to be our patio continued to grow. Maybe we'll get that patio back next year!


5.26.2012

The Big Pour

The first Saturday in May, I awoke to quite a bit of commotion in the back yard. Yup, it was time to pout the concrete. Jeff and Doug were here bright and early to join in the mess fun. 


One of the most important and time sensitive parts of this job was making sure the the anchor bolts that will secure the columns to the foundations were properly located. Here, Greg is triangulating the location of the center bolt, with the help of Doug and Jeff at the other end of the tapes. At least he knew that the anchor bolts would be correctly spaced from each other because of the jog he built. Pardon the screen in this shot. I couldn't open the door or I would have hit Jeff (the yellow blob in the corner) in the head. 


With the anchor bolts properly set, it was time to fill in the rest of the slab. 



The guys took turns bringing the wheelbarrow to the concrete truck to for a load to dump in the slab. It took at least two people to move the wheelbarrow when it was full. The original intention was to have the truck much closer to the slab. But we'll get to that part of the story in a minute. 


Once the slab was full, they used a 2x4 to smooth the surface, and make sure it was nice and level.



So, we needed about 3 cubic yards of concrete to fill in our 4 foundations and our slab. We opted to have a concrete truck come deliver this, as opposed to having to mix dozens upon dozens of bags of concrete ourselves. 


As I mentioned, we had hoped that the truck would be able to make it into the back yard to pour directly into the slab. But, well, it had been raining for a few weeks, or so it felt, by that point. And, 3 yards of concrete plus the weigh of the truck carrying it isn't exactly light. 
  

So, the truck got stuck in the yard. Dangerously close to the edge of the house. 


And, it did a number on our path in the process. Good thing we plan to redo the driveway and this path later this fall. 



It also pretty much blocked access from the back side of the truck, where the concrete comes out, around the corner of the house. Which meant that the guys had to push the wheelbarrow all the way around the front of the house, around the red fence, and navigate the dirt and rock pile in our former patio to get the concrete where it needed to go. Not fun. 


And then there was the little matter of getting the truck out of the yard. The concrete guy called one of his employees, who showed up in a dump truck, with a really long chain. 


Greg held our drooping electrical wires out of the way during the tow. I would like to pretend I hadn't seen this!


Thankfully, it worked, and we didn't have to spend an extra $900 to have the truck towed out professionally. Then, all that was left was a lot of destruction, and some really deep ruts in our lawn. 




(Greg is 5'-10", Jeff is 6'-4)


Oh, and a fresh new concrete slab that was just dying for an inscription. 








5.13.2012

Prepping for Concrete

The next major step in creating the deck was to pour the concrete for the foundations and the slab that will become the floor of our shed. But in order to do that, there was a lot of prep that needed to be done.


The holes needed to be protected for over a week from days upon days of April showers. Some of the many rocks that were unearthed came in very handy in holding down the plastic sheeting. 


We had a brief weekend getaway to DC for my friend Tracy's wedding, and then the clock started ticking down to our 8am Saturday morning concrete delivery last weekend. Which meant Greg was outside almost every night that week until dark, digging, and setting up the forms for the slab. 









He also created a jig to hold the three anchor bolts which will fasten the deck posts to the foundations so that they would be spaced exactly the right distance from each other, and all he would have to do after the concrete was poured was make sure they were the correct distance from the house. 


The next step was to lay a bed of sand to create a base for the concrete that would separate it from the earth below. This mean that Greg got to drive his truck into the back yard, one of his dreams come true!


Michael and and Bob came over for the final push to help spread and tamp the sand. (I take a lot of these pictures through the screen door, which you can see in the shot below)


It was definitely dark by the time they finished, but everything was finally ready for concrete!