5.13.2012

Prepping for Concrete

The next major step in creating the deck was to pour the concrete for the foundations and the slab that will become the floor of our shed. But in order to do that, there was a lot of prep that needed to be done.


The holes needed to be protected for over a week from days upon days of April showers. Some of the many rocks that were unearthed came in very handy in holding down the plastic sheeting. 


We had a brief weekend getaway to DC for my friend Tracy's wedding, and then the clock started ticking down to our 8am Saturday morning concrete delivery last weekend. Which meant Greg was outside almost every night that week until dark, digging, and setting up the forms for the slab. 









He also created a jig to hold the three anchor bolts which will fasten the deck posts to the foundations so that they would be spaced exactly the right distance from each other, and all he would have to do after the concrete was poured was make sure they were the correct distance from the house. 


The next step was to lay a bed of sand to create a base for the concrete that would separate it from the earth below. This mean that Greg got to drive his truck into the back yard, one of his dreams come true!


Michael and and Bob came over for the final push to help spread and tamp the sand. (I take a lot of these pictures through the screen door, which you can see in the shot below)


It was definitely dark by the time they finished, but everything was finally ready for concrete!







5.07.2012

Dirt, Dirt, and More Dirt

Greg has been making fast and steady progress on the deck. I'm being slow and falling behind in telling you about it. So how about a ridiculous amount of photos to make up for it?

A few weeks ago, we had a contractor come with a bobcat and an 18" auger to drill the 4 foot deep holes required for the deck footings. As usual, there was some prep work leading up to that. Greg started digging out the slab area so that the grade of the ground would be at the right depth for the footings. He also had to measure out the locations for the holes. 



Bright and early a few Saturday morning ago, this crazy vehicle showed up in front of our house. 


I caught a glimpse of it going by the office window into the back yard. 


This is what it looked like through the screen door that now goes to no where. 


I also caught a glimpse through the window in the basement. 


As I mentioned, the holes had to be 4 feet deep. And it turns out we have an extremely rocky yard. This meant a lot of in and out of the holes for Greg trying to get the rocks out of the way of the auger. 




Don't worry, it wasn't actually spinning at this point. 


It only took a few short hours for the bobcat to complete it work, and for our grass to disappear!



Sometime before the bobcat left, Doug arrived to help out for the afternoon. They got all the sonotubes placed in the holes in the correct place. For those who don't know, think giant toilet paper roll. This is what holds the concrete in the proper shape to create the footing. 


This was my vantage point, from the hammock, safely removed from the dirt!


Even Greg managed to take an occasional break. 


The last step of the day was to cover all the holes with plastic because of the several days of rain that were forecast following this beautiful sunny one. 


And yes, I was kidding when I said this day was about dirt, dirt and more dirt!











4.17.2012

Deck and Destruction

Ever since we made an offer on this house, we knew we would want to add a deck someday, in place of this rickety little porch off the dining room. We came up with a preliminary design last year, and spent some time tweaking it this winter. We wanted to think about the final, final result, if someday, we were to enclose the new deck to make a screened in porch, then would we want to add another deck, for example. The first phase was finally settled on, and we get out building permit this last Friday. I was told I'd better hurry up and get the before shots because Greg was ready to start the demo process bright an early the next morning. 


The new deck will hold the same edge to the right of the door as the old porch, because we do not want to obstruct the basement windows. This constraint limits the possibilities somewhat, but we're happy with our plan. We're going to come out from the house 12 feet, and past the corner of the house toward the patio by an addition 4 feet, for a grand total of a 12 x 14 deck. This should be plenty big enough to hold out table if we decide to bring it up from the patio, and the grill. I'm really excited to have the grill right off the dining room. I think it will be a lot easy to grill quick dinners early and later in the season. 


The old porch served as a bit of a storage area. But the new deck is going to be fully enclosed underneath! It will hold out bikes, the lawn mower, the snow blower except in the winter, out door furniture, garden supplies, etc. It won't be full standing height, probably closer to 5 feet of head room, but it will still take tremendous pressure off of the garage. We're really looking forward to this feature. 


Greg, the structural engineer, was not at all satisfied with the foundation under these stairs. We did go up them one last time, after which he admitted we shouldn't have!


Bye-bye rickety old stairs!



Sure enough, the next morning when I came downstairs at 8:30, this is what I saw. Greg put in a temporary support, unfastened 4 bolts, and was ready to pull down the whole structure. 


He grabbed ahold of the temporary support, and gave one swift pull. The whole entire stair tipped over as one unit. It was quite dramatic! I think he was a little bit in shock that it was so easy. 



The next day, Greg spent the entire day prepping for construction. First, he had to establish access to the back yard for the equipment that is needed to dig the 18" diameter 4' deep holes for the foundations. We were considering temporarily removing two sections of the red wooded fence on the patio side of the yard. That would have also required removed 3-4 of the forsythias (which I would completely be ok with). But, when we gave it another thought, we realized that it would be better to have more permanent back yard access on the other side of the house where the chain link fence is. We'd like to replace it eventually with a double gate that would be wide enough to drive the truck through. 



Greg dismantled everything carefully in case we do want to put this fence back up in the interim. It is nice to have a (mostly) fenced in yard, even though I think this particular fence is incredibly ugly!


As usual, Greg made short work of the demo, and even dug up two of the over grown, ugly bushes along the side of the house. We'll replace those with something nicer and more manageable someday too. (There is a lot of someday here, but I have faith!)


 The next task he took on was to clear the grass from the slab and foundation area.


There is a bituminous slab that was under the old stair. We decided it would be easiest to leave this in place, and pour the new concrete slab around it. It's clearly sloped, so I'm not sure yet how Greg plans to handle this detail. 


Since we decided not to take down the wood fence, Greg is using the patio to stash all the extra dirt and rocks. 


But, he had already cleared most of the patio stones in anticipation of equipment driving over them. This will give us an opportunity to set these stones in a more level condition, with landscape fabric and sand and whatever else should be in them. It will be nice to eliminate some of the tripping hazard. 


We'll be getting a dumpster in a few weeks to take away all the construction debris. In the meantime, Greg has started a waste pile in the back of the yard. 


Yes folks, that was all in one weekend's work for my rock star husband!











2.22.2012

Orange Curtains



The additions from our recent trip to Ikea just keep coming. While we were there, we also picked up this set of orange curtains four our bedroom. We still have to tweak how they are hanging, hem them, and replace the blue finials on the curtain rod. But, we are loving how it is making the room feel much cozier and more finished. Greg actually said last night, "I've never had a pretty bedroom before!" I think he thinks it's a good thing. 

2.20.2012

Wall Cabinets


We're still working on getting the office all set up and put back together. The latest phase was building and installing these wall cabinets we picked up at our recent trip to Ikea. Since we keep such a wide variety of stuff in the office, and it's not all nice to look at, we really liked the idea of these floating cabinets with doors. They are up on the wall because ultimately we will be putting a couch under them so we will have more space for guests. 


Constructing them went pretty quickly. They were all built the evening we brought them home. The amount of cardboard packaging from 4 cabinets with 5 doors was quite insane!



The installation went pretty smoothly, because as usual, Greg doesn't mess around. This system, the Besta system, which is the same one we used for our storage in the basement, comes with this nice mounting rail. Greg installed all the rails on the wall first. The spacers between them made it really easy to get all the cabinets up on the wall in exactly the right spot.


Here's what they looked like before the doors went on. We wanted to put them high enough on the wall to leave room for the couch, but low enough so that we could still stash more attractive stuff on top. We also used a single unit on the floor which will serve as an end table for the couch. Originally, we had wanted a tall, vertical cabinet to that the storage until would be a continuous L shape. But, we ran into a little problem with the light switch location, which would have fallen in the middle cube of the vertical cabinet. This solution seemed to work our pretty well. 

So, yeah, we know, we have a lot of stuff. Here's a peak inside the cabinets at some of it. 


This cabinet holds most of my crafting supplies. 


This one has ironing and other miscellaneous laundry supplies, and other random housewares like heating pads and ace bandages. We also ended up with a shallow height shelf which is working perfectly for my large format printing paper, sketch pads, etc. 


The last cabinet holds a bunch of Greg's random computer parts, CDs, software, etc.


Here's how it's looking now. You can see, we'll be able to fit a lot of that stuff on the top. Even though we have a lot, we are trying to purge...see, there are 4 empty bins up there. Really!

So, the room continues to be a work in progress. I may never get a glamour shot, but it's become a much more pleasant place to be with each step we take. I can't wait to see how the couch looks when we finally get it back from my mom's basement later this spring.