The insulation team is scheduled for mid-November. Greg is making great progress on prepping the attic. Last weekend, with the help of his brother Jeff, the framing for the platform was largely put in place. Click here for the before shot. In addition to the attic space, the eaves off our bedroom will be insulated. Greg has been pulling out all the existing whimpy layers of insulation, and in addition, ripped down the partition that used to divide the eaves into two separate spaces. You can see, we are already making good use of this space. Although, I hope some day (many years from now!) it will be a master bath and a walk-in closet. 